Project detail
Country: | ITALY |
---|---|
Location within Country: | RODI GARGANICO |
Name of Client: | LOCAL MUNICIPALITY |
Start date (month/year): | 2001 |
Completion date (month/year): | 2008 |
Value of contract(€): | 100,000 |
Total N° of staff-months of the assignment: | 30 |
Value of services provided by Consultant(€): | 100,000 |
Date: | 15 Oct, 2015 |
Category: | Coastal Engineering, Water and Environment |

Description
Feasibility study, environmental quality (water) study, infrastructural and logistic conditions analysis, detail infrastructures design.
TZERO was in charge for the feasibility study and the preliminary and final design of the Tourist Port in Rodi Garganico (Foggia).
The definitive part of the project of the tourist port consists in the construction of the outer breakwaters and the enlargement of the onshore parts.
The adopted configuration, chosen between two propositions of the marine-meteorological study created a mooring basin capable to host in a secure manner almost 360 posts, with about 15.000 m2 of inland space (besides the two breakwaters), that should be enough to satisfy the demands of mooring and the collateral activities. The new large quay of underflow would guaranty the service for the bathing as well as the boarding point for the passenger direct to TremitiIsland.
In the frame of this project a particular attention has been given to the environmental issues especially related to water quality.